PILLAR served as an advisor to Miller Infrastructures, an O&M subcontractor; prepared a routine O&M estimate for this project, the longest cable stay bridge in the U.S.
TXDOT New Harbor Bridge
![](https://www.pillaroma.com/wp-content/uploads/2018/11/new-harbor-bridge-texas.jpg.png)
PILLAR served as an advisor to Miller Infrastructures, an O&M subcontractor; prepared a routine O&M estimate for this project, the longest cable stay bridge in the U.S.