PILLAR was hired to write an operational O&M manual and schedule for this 3.4-kilometer span, one of the busiest in North America with 50 million vehicles crossing it each year.
New Champlain Bridge (NBSL)
![](https://www.pillaroma.com/wp-content/uploads/2018/11/new-st-lawrence-bridge-champlain-1.png)
PILLAR was hired to write an operational O&M manual and schedule for this 3.4-kilometer span, one of the busiest in North America with 50 million vehicles crossing it each year.