PILLAR joined forces with several other engineering firms to help in the design and construction of the new water plant on the New River. PILLAR’s responsibility in the project included boundary and topographic survey and plats for design and construction inspection for the three divisions. Division 1 consisted of the plant and intake construction; Division II included the installation of the 30” raw and 24” finish water line; Division III encompassed the hanging of a 24” concrete insulated pipe on a steel girder bridge crossing the New River. The $17 million plant went operational six months ahead of schedule.