Hired by the maintenance contractor of various rest areas managed by VDOT, PILLAR performed a facility condition assessment of the rest areas. The resulting repair list of deficiencies and safety issues was provided to the contractor before it entered into a maintenance contract with VDOT so that it was fully aware of the physical state of the facilities.
Rest Area Condition Assessments
![](https://www.pillaroma.com/wp-content/uploads/2018/11/rest-condition-assessments.jpg.png)