Rest Area ADA Compliance

38 curb ramps and 16 associated pathways located throughout 14 VDOT safety rest areas did not meet current Americans with Disabilities Act (ADA) standards.

Stormwater Basin Inspection

VDOT Salem District faced possible nes from the Department of Environmental Quality for failure to maintain stormwater detention basins in 112 locations across 4 residencies.

Underground Stormwater Basin Inspection

VDOT Bristol District had 4 underground stormwater management detention basins comprised of large pipes along Route 23 in Norton, VA. Joint separation and cracking prevented optimal function and put the district at risk for sinkholes, blockages, and pavement and slope failures.

Pipe Inventory

VDOT Fredericksburg needed to develop work plans for the upcoming year based on needs for drainage projects, but didn’t have locations or condition assessments. They wanted to collect pipe locations and conditions on I-95 and US Rout 1 prior to the end of the fiscal year to develop data-driven work plans and budgets for the following year.

Pipe Inventory and Condition Assessment

After significant rain events along 48 centerline miles of the I-95 corridor in the Richmond VDOT District, roadways experienced poor drainage and standing water. The Richmond District needed to conduct routine maintenance to alleviate the issues, but they lacked drainage asset information to make a prioritized work plan.

Route 23 Pipeline

VDOT lacked the necessary information in Wise County to develop work and budget programs for a 5.3-mile section of Route 23.